Wednesday, April 30, 2008
Thursday, April 24, 2008
Day Fourteen




Day Thirteen



Wednesday, April 23, 2008
Day Twelve
In the late morning, Slawek called me. My stomach always sinks when I see that it is him calling. Luckily, this time he was only looking for the hinges, which I had stashed away in the less-dusty secondary staging area—the second bedroom.
When Brian got back, Javier and Slawek were there. I have a really hard time communicating on the phone with Slawek, so Brian called and “translated’ the remaining questions that Slawek had. Simple things like, “is the filler panel near the furnace room door flush with the cabinet door or set back?” and “does the cover panel that goes below the wall cabinets overlap the backsplash, or the other way around?” Brian and I called back and forth through the afternoon. In New Orleans, we were commissioning a renovated high school auditorium. I kept tabs on what was happening inside with the tuning of the audio system, and kept stepping outside to take the phone calls. Gladly, I only really had about an hour of fixed schedule through the day.
Also about that time, ABT called about the appliance install. While I feel that the level of service is high and that everyone is pleasant, I feel like the information sharing from ABT hasn’t been that great. Maybe we missed the “So, you just bought appliances from us. Now what?” orientation and training session. I’m kind of embarrassed that I hadn’t thought of this, actually. On the appliance install date, we will not have a countertop, which means that the cooktop cannot be installed. Duh. But, it’s kind of chicken-and-the-egg, as we need the cooktop template to fabricate the countertop. In the end, we have arranged for ABT to bring the cooktop on Thursday during their initial walk-through. Then, on Tuesday, all of the appliances except for the dishwasher and cooktop will be installed. They will then return on the following Tuesday to finish the cooktop and dishwasher. In the meantime, we pray that the countertop stays on schedule. Luckily, it’s not an extra charge for them to come out twice. Unfortunately, this means the full completion will be May 6—one day short of a full month since the start of the project.
I should say that Brian, after not having seen the room for a number of days (since before the floor went in) was very excited about the progress and pleased with the look. He sent me some photos in the evening (they were big files, so I couldn’t upload them to the blog right away). Here they are.
Monday, April 21, 2008
Day Eleven




Weekend 2
drive to the lighting store to pick up the track lights. I think this
is the last of the 'owner-purchased' items, with possible exception of
the composter, which it probably at Brian's office.
In the afternoon, I took a walk to run a couple of errands and to get
an early dinner. I spent the evening organizing the stacks of
receipts, invoices, and bills.
On Sunday morning, a took a Zipcar to the laundrymat to catch up on
two week's worth of clothes. I think I'll be able to hold out, now,
until the appliances are installed.
In the afternoon, I started reorganizing the dining room and cleaning.
It was kind of like playing one of those puzzle games where you have
to move all the squares around to form the image, but you only have
one blank space.
By the end of the night, the cabinets were lined up in order of
installation and all of the boards for the trim panels were labled and
marked with instructions. The picture, here, is from early in the
evening; it is still light out.
Friday, April 18, 2008
Day Ten (evening)



Day ten (afternoon)
> way. But, for now, I'll ride the Green Line back and forth.
>
> In the late afternoon, just as I was attempting to finish editing a
> portion of a major proposal, I got a friendly message from my
> contractor (pause. I nearly just had my iPhone stolen. Would have,
> if my Green Line intuition hadn't kicked in.) which killed my mood
> and capacity for original thought.
>
> Three things:
> - there was some ambiguous message about the cable outlet that was
> moved. It was in the right place to start with. I'm pretty sure that
> Oscar know what was needed, which was that the cable pass needed to
> be installed. I sure hope Jim is wrong.
> - no cabinets until Tuesday and maybe no work tomorrow. This is only
> a problem because Tuesday is the only morning during the whole
> project on which Brian and I will both be away. I need to set up a
> meeting with the installer for Monday, I guess.
> - the mirrors were installed. This I found out just after Brian
> called from Poland and asked specifically if the guys on site knew
> that we wanted the paint cleaned up at the edge of the old mirrors
> before install. I assured Brian that the mirrors would not go in
> until next week.
In my distraction and haste at the end of the day (I sure as hell
wasn't going to stay late on a day when I had already taken half of a
vacation day), I left my keys on my desk when walking out with Greg
and Evelyn to go get a drink. (The toast was to "survival.") I only
realized when I got downtown to transfer to the Red Line. So now, I
ride the Green Line back and forth with the bandits who are encouaged
by the warm weather wonderingvwhat the status of the kitchen really is.
Day Nine

Thursday, April 17, 2008
Day Eight
supply store to pick up the sink. In the afternoon, he flew to Poland.
The sink looks great. I had been a bit nervous about it since we had
never seen one in person.
Brian met with the contractors before he left, coordinating some
things in the den.
Aside from some correspondence with Jim about the floor, the rest of
the day was quiet. And, aside from not having heard from the
electrician since Friday, everything was going well.
After the first Frisbee night of the season, I arrived home at about
8:30 to find two guys pulling electrical wire. They were, just like
anyone would be, laughing and carrying on, trying to make the best of
working so late. I really can't even believe that our contractor is
so schedule-concious.
The drywall on the East wall is nearly complete now, as well as the
additional framing in the wall in the den.
Tuesday, April 15, 2008
Day Seven


Monday, April 14, 2008
Day Six

Weekend
Brian got up with me when I left Savor and got a Zipcar to drive to Homewood so that he could do some research on our damages at to the hardware store and glass store that his Mom had recommended. The wood stain was not a successful venture, partially because the board that was actually damaged was somewhat of an outlier in the color of the floor boards. At the glass store, he found that the replacement cost would hover around $300.
After some other errands, Brian picked me up at the end of my shift at Savor. We headed to 'burbs. We stopped at ABT to view our appliances and look at the TV we selected. Then, at Ikea we reviewed the options for drawer inserts and purchesed at least enough to get us started. We also stopped at container store to buy the slide-out drawer that the composter will sit in. After a quick lunch/dinner, we drove to Oak Park to pick-up the fans. Again, we had to totally unpack and repack the car to fit everything.
At home later, we wrote a big, long email to our contractor outlining all of the unresolved issues and informing him about the mirror issue.
Sunday
We finally slept in. For the rest of the day, Brian got caught up on schoolwork and worked on setting up the new network. I dusted, swept, mopped, vacuumed, Swiffered, and organized. When I ran out of cardboard to protect the dining room floor, I assembled the new shelves for the Den to use their boxes. In the evening, we had our condo board meeting and we went out for dinner and drinks with Tim. Ah, to have a normal life.
Friday, April 11, 2008
Day Five

Ikea called today about our attempted return of our doors. We should receive a new door on Monday via UPS.
Brian spent a portion of his afternoon exploring new network electronics and he ordered our indoor composter, which we will use in lieu of a garbage disposal.
Arriving home, we found that the sleepers and gravel had been removed, the electrical back boxes were complete, our new electrical box had been installed, and that the dryer and exhaust hood changes had been made. I’m really glad to not have been here when the new hole in the masonry wall.
Today’s issue was that one of the mirrors on the dining room wall was cracked where there is an outlet that penetrates it. It must have happened when the electrical panel went in. We’re not exactly sure how this will be resolved yet and how much our contractor will be willing to cover of this damage.
Day Four

The morning was normal for once.
In the afternoon, I spent a significant amount of time trying to confirm the electrical requirements for the new clothes washer. The cutsheet was misleading, and when David and Eric upstairs, had theirs installed some modification was required to the electrical. After two calls to ABT and emails to Eric and Javier, I finally determined that the problem related to the 15amp/240V receptical, and not a standard 120V.
Brian and I both worked late. We had dinner delivered to Brian’s office and then trekked home. Inspecting the day’s work, we found a considerable amount of electrical work complete, the other wall demolished, and the framing for the furred-out section of wall started. We were very encouraged by this progress. And then… we started finding problems. After measuring each and every electrical location and modification, we found that the framing didn’t leave the proper space for the washer and dryer, the conduit for the electrical outlet conflicted with the revised dryer exhaust location, we suspected that the gas line need to be moved to accommodate the exhaust hood connection. We also found that the subfloor in the den was damp—at a location where we have had water damage on the ceiling in the past. During the day, a steady rain was coming from the East—a similar condition to when the past problem occurred. It was about 2 AM by the time I finished and sent an email report to our contractor and an email to the building about our water problem.
Day Three


In the mid-morning, I got a call from Javier, the electrician, asking for the appliance cutsheets. I had intended to leave them out for him, but forgot. I asked for his email address, and forwarded the pdfs that I had compiled for him.
In the afternoon, after his class, Brian got a car for our evening adventure. The original plan was for Brian to pick me up from work and we’d go to iFloor together. At 6:15 PM, it became clear that Brian would not have time to pick me up first, and he headed straight to the iFloor warehouse. I called ahead and let them know that Brian was on his way and might be there right as the store closed or a little later. Thankfully, the manger agreed to stay. Brian picked up the floor—all 14 crates—and drove to my office, arriving by 7:45. We took off immediately for Ikea, arriving there 45 minutes before closing. Brian went to the showroom to order the additional cabinets for the Den and I managed the exchange of the damaged pieces. Unfortunately, one of the replacement doors had the same defect as before. We’d have to order, yet another. Right at 9 PM, closing time, our order was ready at furniture pickup. In order to get all of the Ikea stuff in the car with the flooring, we had to take everything out and rearrange. I had to sit in the back seat behind Brian to accommodate the new Ikea bookshelf.
We stopped for burgers at Bar Louie, then headed home.

Tuesday, April 8, 2008
Day Two

At work, Joan's husband brought some stainless steel samples for us to review.
After work, I worked on the drawings some more, making the changes that have occured since my first meeting with Jim. I think this should be my last drawing update that is required.
... Arriving home, we found that kichen had been cleared and the floor was taken up. I asked our contractor early on whether he thought we actually had subfloor beneath the old 1920's floor; he assured me that we did. Boy was I right. Beneath the floor, we have tar-paper, sleepers, and gravel. Yes, folks that right. Gravel.
The demolition of one of the small walls was completed today, which was fun to see.
The unpleasant surprise was that at the threshold to the dining room, one of the floor boards on the dining room-side was damaged. This board will have to be replaced, and likely before the cork goes in. I hope this doesn't cause any delay.
I spent the rest of the evening drawing on the wall--indicating the electrical locations and some detail drawings. All the dimensions seem to checkout.



Day One


After a rushed morning of final preparations, I was glad that the contractor was about 30 minutes late. Jim arrived with two guys, one of whom will be our project manager, Oscar. Jim and I talked over the plans and the couple of changes we've made since he received the drawings--including the replacement of the floor, the work in the den, and some electrical. After writing the big check, I headed to work.
During the day, Brian confirmed with ABT our order of our new TV for the den. We decided to add this work to the project, since the flat-panel bracket will require revision of the wall framing and some electrical work. The TV will arrive along with the appliances. Brian scouted out another good deal.


Wednesday, April 2, 2008
everything INCLUDING the kitchen sink