supply store to pick up the sink. In the afternoon, he flew to Poland.
The sink looks great. I had been a bit nervous about it since we had
never seen one in person.
Brian met with the contractors before he left, coordinating some
things in the den.
Aside from some correspondence with Jim about the floor, the rest of
the day was quiet. And, aside from not having heard from the
electrician since Friday, everything was going well.
After the first Frisbee night of the season, I arrived home at about
8:30 to find two guys pulling electrical wire. They were, just like
anyone would be, laughing and carrying on, trying to make the best of
working so late. I really can't even believe that our contractor is
so schedule-concious.
The drywall on the East wall is nearly complete now, as well as the
additional framing in the wall in the den.
No comments: